We propose to perform a proof-of-principle test of a target station suitable
for a Neutrino Factory or Muon Collider source using a 24-GeV proton beam incident on a target
consisting of a free mercury jet that is inside a 15-T capture solenoid magnet. This test
could be performed in the TT2A tunnel of the NTOF proton line (upstream of the spallation
target). The tests would require only ~100 fast-extracted pulses of full PS
intensity, delivered in a pulse-on-demand mode of operation over about 10 shifts. The main piece of
apparatus is the LN2-precooled, 15-T copper magnet with a 15-cm-diameter warm bore and total
volume slightly over 1 m3. The principle diagnostic is a high-speed optical camera. The
mercury jet is part of a closed mercury loop that includes an insert into the bore of the
magnet.
Proposal (submitted to INTC): Studies of a Target
System for a 4-MW, 24-GeV Proton Beam
Approved as nToF11, alias MERIT
MERIT Control room (272 S-002): Tel.
75337 or 75622
Cellular(s): 160345 and 162845
CERN Control room (Prevessin): Tel.
76677
or 77500
Online information
about the experiment
- 10 October 2008: Beam spot and alignment (IE), VRVS
- 25 September 2008: Beam Spot Analyiss (IE), VRVS CERN
- 25 September 2008: Beam Spot Analysis (IE), VRVS CERN
- 19 December 2007: Patt.Det. - Status (MP), VRVS
- 30 November 2007: Beam spot analysis (IE), VRVS
- 27 November 2007: Part. Det. - Status (MP), VRVS
- 16 October 2007: Optical diag. - status (HP), VRVS
- 09 October 2007: MERIT status @ CERN (AF), VRVS
- 05 October 2007: Opt. diagn. - status (TT), VRVS
- 29 August 2007: MERIT beam status (AF), VRVS
- 29 August 2007: 28 Aug. access report (HK), VRVS
- 29 August 2007: Part. Detectors in MERIT beam test (MP), VRVS
- 18 July 2007: MERIT status (KMcD), VRVS
- 18 July 2007: Part-detector status (MP), VRVS
- 18 July 2007: Optics status (TT), VRVS
- 20 June 2007: MERIT baseplate (VG), VRVS
- 20 June 2007: MERIT installation status (KMcD), VRVS
- 04 April 2007: Summary pre-installation review (AF), VRVS
- 04 April 2007: Summary pre-installation review (pdf) (AF), VRVS
- 21 March 2007: MERIT arrival at CERN (IE), VRVS
- 14 March 2007: Action items (IE), VRVS
- 14 March 2007: Schedule @ CERN (IE), VRVS
- 14 March 2007: Cryostat pressure tests at MIT (PT), VRVS
- 13 March 2007: Magnet traces at MIT (PT), VRVS
- 07 March 2007: Test runs at MIT (2) (TT), VRVS
- 07 March 2007: Joint and conflat leakage (PT), VRVS
- 07 March 2007: First analysis of jet images at MIT (HP), VRVS
- 07 March 2007: Particle detectors - status (MP), VRVS
- 21 February 2007: MERIT schedule (IE), VRVS
- 14 February 2007: Controls panel - Hg jet (VG), VRVS
- 14 February 2007: CERN cryo update (FH), VRVS
- 07 February 2007: Hg system - status (VG), VRVS
- 24 January 2007: Flex hose in Hg loop (VG), VRVS
- 24 January 2007: Hg flex-hose page 21 (VG), VRVS
- 17 January 2007: Nozzle welding (KMcD), VRVS
- 20 December 2006: US update (), VRVS
- 20 December 2006: Cyogenics at CERN (FH), VRVS
- 13 December 2006: ACEM particle detectors (MK), VRVS
- 06 December 2006: Jet movies (CERN copy) (HP), VRVS
- 06 December 2006: Nozzle tests at ORNL (), VRVS
- 22 November 2006: Hg-loop status (VG), VRVS
- 08 November 2006: Nozzle and beam windows (KMcD), VRVS
- 08 November 2006: Weekly documents (), VRVS
- 07 November 2006: Cinematics: Hg loop at MIT (PT), VRVS
- 11 October 2006: Cryogenics - Status (FH), VRVS
- 04 October 2006: MERIT schedule (AF), VRVS
- 04 October 2006: Cryogenics - Status (FH), VRVS
- 20 September 2006: VRVS documents (HK), VRVS
- 20 September 2006: Hg loop - 1st water test (VG), VRVS
- 13 September 2006: Cryogenics - 3Dview (JM), VRVS
- 09 August 2006: Collimator design (NO), VRVS
- 02 August 2006: Hg loop - status (VG), VRVS
- 19 July 2006: Optical diagnostics - update (TT), VRVS
- 19 July 2006: CERN installation - update (AF), VRVS
- 14 June 2006: Timing and trigger (HP), VRVS
- 30 May 2006: Particle yields - simulations (SS), VRVS
- 24 May 2006: Hg loop - process diagram (VG), VRVS
- 10 May 2006: MIT status (PT), VRVS
- 10 May 2006: Particle flux calculations (SS), VRVS
- 03 May 2006: Optical diagnostics: update (HJP), VRVS
- 19 April 2006: Optical diagnostics: mock-up test (HJP), VRVS
- 12 April 2006: MIT status - magnet resistance (PT), VRVS
- 12 April 2006: MIT test status - 15T shot (PT), VRVS
- 12 April 2006: Optical diagnostics: mock-up test (HJP), VRVS
- 05 April 2006: Hg loop test at AHC (VG), VRVS
- 05 April 2006: MIT test status (PT), VRVS
- 05 April 2006: Particle detectors (IE), VRVS
- 05 April 2006: Particle flux simulations (S.Striganov), VRVS
- 05 April 2006: Magnetic forces on the tie-rods (SK), VRVS
- 05 April 2006: video MIT 15T shot (PT), VRVS
- 29 March 2006: MIT test status (PT), VRVS
- 22 March 2006: MIT test status (PT), VRVS
- 08 March 2006: Solenoid status (PT), VRVS
- 08 March 2006: Layout - passages TT2A/TT2 (AF), VRVS
- 01 March 2006: Status solenoid (PT), VRVS Venus (16:30 GMT+1)
- 01 March 2006: Techn. Specifications of the DVB (FH), VRVS Venus (16:30 GMT+1)
- 22 February 2006: Status solenoid and testing (PT), VRVS Venus (16:30 GMT+1)
- 22 February 2006: Hg loop status (VG), VRVS Venus (16:30 GMT+1)
- 22 February 2006: Optical diagnostics - status (TT), VRVS Venus (16:30 GMT+1)
- 21 February 2006: Diagnostics - Status (TT), VRVS
- 08 February 2006: Testing at MIT (PT), VRVS Venus (16:30 GMT+1)
- 01 February 2006: Titanium "snout" (VG), VRVS Venus (16:30 GMT+1)
- 01 February 2006: Diagnostics (TT), VRVS Venus (16:30 GMT+1)
- 01 February 2006: Paintball test (KMcD), VRVS Venus (16:30 GMT+1)
- 01 February 2006: Paintball test - 2 (KMcD), VRVS Venus (16:30 GMT+1)
- 01 February 2006: 3D cut view through TT2(A) at target center (VG), VRVS Venus (16:30 GMT+1)
- 18 January 2006: Safety review anouncement - cryogenics and solenoid (IE), VRVS Venus (16:30 GMT+1)
- 18 January 2006: Layout MERIT - ACAD introduction (AF), VRVS Venus (16:30 GMT+1)
- 08 November 2005: minutes: Towards an affordable valve box (KM), VRVS
- 27 September 2005: Cryo update (FH), VRVS
- 01 July 2005: NuFact logo (US) (), VRVS
- 01 July 2005: Pixel detectors (AF), VRVS
- 07 June 2005: LN2 circuit schema at MIT (PT), VRVS
- 03 May 2005: Cryo scheme update (1) (YI), VRVS
- 03 May 2005: Cryo scheme update (part2) (YI), VRVS
- 03 May 2005: N2 release to TT10 (AF), VRVS
- 03 May 2005: Schematic layout of the window frame (VG), VRVS
- 26 April 2005: Diagnostics irradiation (), VRVS
- 18 January 2005: Optical diagnostics (TT), VRVS
- 07 December 2004: LN2 update (YI), VRVS
- 10 November 2004: New LN2 baseline schema (YI), VRVS
- 09 November 2004: minutes (), VRVS
- 04 November 2004: minutes (), VRVS
- 12 October 2004: minutes (), VRVS
- 07 October 2004: Cryogenic pressure drop in a pipe (YI), VRVS
- 22 September 2004: minutes (), VRVS
- 14 April 2004: LN2 flow schema (FH), VRVS
- 14 April 2004: Cryo budget estimate (FH), VRVS
- 13 April 2004: minutes (), VRVS
- 15 March 2004: minutes (), VRVS
- 06 February 2004: minutes (), VRVS
The standard searches are accessible via the links on the left menu. For specific queries use the check boxes and submit (checked = ONLY, unchecked = ALL):