We propose to perform a proof-of-principle test of a target station suitable
for a Neutrino Factory or Muon Collider source using a 24-GeV proton beam incident on a target
consisting of a free mercury jet that is inside a 15-T capture solenoid magnet. This test
could be performed in the TT2A tunnel of the NTOF proton line (upstream of the spallation
target). The tests would require only ~100 fast-extracted pulses of full PS
intensity, delivered in a pulse-on-demand mode of operation over about 10 shifts. The main piece of
apparatus is the LN2-precooled, 15-T copper magnet with a 15-cm-diameter warm bore and total
volume slightly over 1 m3. The principle diagnostic is a high-speed optical camera. The
mercury jet is part of a closed mercury loop that includes an insert into the bore of the
magnet.
Proposal (submitted to INTC): Studies of a Target
System for a 4-MW, 24-GeV Proton Beam
Approved as nToF11, alias MERIT
MERIT Control room (272 S-002): Tel.
75337 or 75622
Cellular(s): 160345 and 162845
CERN Control room (Prevessin): Tel.
76677
or 77500
Online information
about the experiment
- 09 October 2007: MERIT status @ CERN (AF), VRVS
- 11 June 2007: Safety follow-up (AF),
- 11 June 2007: Solenoid status (HK),
- 30 May 2007: Photos-SolenoidBuild180 (IE),
- 23 May 2007: Solenoid insulation (KMcD),
- 06 April 2007: Kirk's photo safari of the solenoid surface test (KMcD),
- 04 April 2007: Summary pre-installation review (AF), VRVS
- 04 April 2007: Summary pre-installation review (pdf) (AF), VRVS
- 30 March 2007: Installation review (IE),
- 22 March 2007: Cryo status @ CERN (JM),
- 21 March 2007: MERIT arrival at CERN (IE), VRVS
- 14 March 2007: Cryostat pressure tests at MIT (PT), VRVS
- 07 March 2007: Joint and conflat leakage (PT), VRVS
- 05 March 2007: MIT integrated tests (AF),
- 14 February 2007: CERN cryo update (FH), VRVS
- 20 December 2006: Cyogenics at CERN (FH), VRVS
- 08 November 2006: Weekly documents (), VRVS
- 11 October 2006: Cryogenics - Status (FH), VRVS
- 04 October 2006: Cryogenics - Status (FH), VRVS
- 13 September 2006: Cryogenics - 3Dview (JM), VRVS
- 22 March 2006: MIT test status (PT), VRVS
- 13 March 2006: Review report solenoid&cryogenics (AA),
- 01 March 2006: Techn. Specifications of the DVB (FH), VRVS Venus (16:30 GMT+1)
- 03 February 2006: Safety review - solenoid and cryogenics (), Room A (61-1-017)
- 27 January 2006: Installation TT10 exhaust line (AF),
- 20 January 2006: LN2 flow calculations (PT),
- 18 January 2006: Safety review anouncement - cryogenics and solenoid (IE), VRVS Venus (16:30 GMT+1)
- 15 December 2005: Cryogenics discussion (IE),
- 12 December 2005: MERIT review (), BNL
- 12 December 2005: BNL: review: cryogenics (FH),
- 08 November 2005: minutes: Towards an affordable valve box (KM), VRVS
- 27 September 2005: Cryo update (FH), VRVS
- 29 June 2005: note: Induced radioactivity in the MERIT experiment (MS),
- 27 June 2005: Collaboration meeting (), CERN
- 27 June 2005: UNICOS at CERN (MP), Coolaboration meeting, CERN
- 27 June 2005: Examples of cryogenic installations at CERN (OP), Coolaboration meeting, CERN
- 07 June 2005: LN2 circuit schema at MIT (PT), VRVS
- 03 May 2005: Cryo scheme update (1) (YI), VRVS
- 03 May 2005: Cryo scheme update (part2) (YI), VRVS
- 03 May 2005: N2 release to TT10 (AF), VRVS
- 20 April 2005: simple 3D scheme of MERIT cryogenics (FH),
- 07 December 2004: LN2 update (YI), VRVS
- 15 November 2004: Collaboration meeting (), Princeton
- 10 November 2004: New LN2 baseline schema (YI), VRVS
- 12 October 2004: minutes (), VRVS
- 07 October 2004: Cryogenic pressure drop in a pipe (YI), VRVS
- 14 April 2004: LN2 flow schema (FH), VRVS
- 14 April 2004: Cryo budget estimate (FH), VRVS
- 31 March 2004: MERIT meeting (), CERN
The standard searches are accessible via the links on the left menu. For specific queries use the check boxes and submit (checked = ONLY, unchecked = ALL):