Mercury loop
general information
 | Cut view
through TT2/TT2A at target center |
 |
UCLA MHD simulations |
 | Specifications as of
10th August for vendor inquiry |
 |
Syringe-solenoid separation |
 | Magnetic
loads on mercury loop |
 | Magnetic
forces on a steel pipe close to the solenoid |
 | cross section from TT2A to
TT10, May 2005 |
 | Schedule Review version
9 |
 | e-drawing update:
common setup,
syringe (April 2005) |
 | CERN Hg Jet Experiment Overview March 05 |
 | Target System Design Requirements Document Version 6,
Hg loop,
Operation
scenario |
 |
presentation
(new version)
on updated jet chamber, 13.Jan.2005 |
 | jet chamber,
updated design,
inner part, 11.Jan.2005 |
 | Jet simulations in a
B-field |
 | Hg Nozzle (ppt,
pdf) |
 | Hg Catcher (ppt,
pdf) |
 | Target System Design Requirements Document
v5 (obsolete
v4: pdf,
doc) |
 | Layout beam-solenoid-jet |
 | Layou
drawing (by V.B.Graves),
EASM viewer. |
 |
layout beam-solenoid-Hg_jet |
 | First design of the
Hg loop placed in the solenoid (MR) |
meetings
 | 12th August 17:00 (GMT+2)
|
 | 2.August 2005 (video):
|
 | 19.July 2005: video: Baseplate - updated |
 | 29.March 2005: video:
Mercury Loop
update |
 | 13.Jan.2005: phone (631-344-6261),
slides by V.B.Graves |
 | 7.Dec.2004: video: Jet simulations in a B-field |
 | 23.Nov.2004: video (82252)
 | Summary of the Princeton review meeting on the mercury loop (pdf) |
|
 | collaboration meeting 15./16.Nov.2004
|
 | 21.Oct.2004:
|
 | 18.Februar 2004: Mercury loop,
minutes |
|