| Interface to PS/SPS, ABIC
Feb. 2006 |
| Layout Merit - ACAD
introduction |
| Time schedule CERN |
| update on experimental layout in tunnel TT2A[photogallery/photo00027913/real.htm] |
| preliminary time schedule for CERN installation |
| cross section from TT2A to
TT10, May 2005 |
| Schedule Review version
9 |
| e-drawing update:
common setup,
syringe (April 2005) |
| 8.April 2005: phone: Muon Collaboration Friday Meeting,
slides |
| e-Drawing:
syringe in cern tunnel March 05.easm |
| eDrawing
with syringe tunnels (V.Graves) |
| CERN
infrastructure, , talk to US-MC Feb05 |
| presentation (ppt) to the RPC, 1.Dec.2004 |
| Overview presented to people from AB/ABP, AB/ATB and SC:
The TT2A target Experiment |
| update to the
Research Board (protected) |
| minutes 5.Nov.2004 |
| meeting J.Engelen (minutes
protected) |
| collaboration meeting Japan, July 2004,
notes |
| CERN collaboration meeting,
minutes March 2004 power supply, PS beam, pulse list, time schedule |
| orientation of beam-solenoid-jet (considerations) |