Home
Up

General considerations

bulletInterface to PS/SPS, ABIC Feb. 2006
bulletLayout Merit - ACAD introduction
bulletTime schedule CERN
bulletupdate on experimental layout in tunnel TT2A[photogallery/photo00027913/real.htm]
bulletpreliminary time schedule  for CERN installation
bulletcross section from TT2A to TT10, May 2005
bulletSchedule Review version 9
bullete-drawing update: common setup, syringe (April 2005)
bullet8.April 2005: phone: Muon Collaboration Friday Meeting, slides
bullete-Drawing: syringe in cern tunnel March 05.easm
bulleteDrawing   with syringe tunnels (V.Graves)
bulletCERN infrastructure, , talk to US-MC Feb05
bulletpresentation (ppt) to the RPC, 1.Dec.2004
bulletOverview presented to people from AB/ABP, AB/ATB and SC: The TT2A target Experiment
bulletupdate to the Research Board (protected)
bulletminutes 5.Nov.2004
bulletmeeting J.Engelen (minutes protected)
bulletcollaboration meeting Japan, July 2004, notes
bulletCERN collaboration meeting, minutes March 2004
power supply, PS beam, pulse list, time schedule
bulletorientation of beam-solenoid-jet (considerations)