 | Technical Specification
for the supply of a Cryogenic Valve Box for liquid nitrogen distribution
|
 | Installation preparation:
TT10installationJan06.pdf |
 | Cryostat status at CVIP, Nov.
2005 |
 | DVB specifications
for tender (out of date, see above) |
 | video 8.Noc.2005: Kirk's message |
 | Collaboration meeting June 2005:
cryo Controls (Pezzetti),
mechanics cryo (Pirotte) |
 | video 6.June 2005:
LN2 circuit for MIT test |
 | 24.May 2005: Cryogenics
scheme with buffer tank |
 | Cryogenics scheme with
buffer tank (old version) |
 | 10.May 2005: release of nitrogen to TT10,
ppt |
 | basic cryogenics layout in TT2A (3D) |
 | 7.Dec.2004: video: Cryogenics update |
 | 23.Nov.2004: video: flexible LN2 transfer lines, pressure drop analysis
(pdf) |
 | 9.Nov.2004: video (82252) cryogenics,
slides FH,
slides YI |
 | 4.Nov.2004: collaboration meeting (minutes
4.Nov., minutes 5.Nov.2004) |
 | 21.Oct.2004: phone (631-344-6261)
|
 | 12.Oct.2004: video (IP 82252)
|
 | 14.Sept.2004:
|
 | 13.April 2004: Cryogenics & solenoid status,
minutes F.Haug,
notes |
 | minutes collaboration meeting
CERN March 2004 |
 | 6.Februar 2004: LN2 circuit
Magnet cycle & LN2 sketch,
minutes |