 | AF presented the idea and basic layout of the TT2A target experiment. |
 | FC is responsible on safety issues concerning fire&material |
 | he recommended
 | separate pump motor from eny other devices |
|
 | outer sources of fire so far identified
 | pump moter |
 | is pump motor using oil? |
 | solenoid quench |
 | beam in solenoid |
 | cabling |
 | power supply |
|
 | is the cold mass of the solenoid and the solenoid itself capable to
withstand a quench (rapid heating): over pressure, temperature rise |
 | FC wanted to know the flow and pressure in the LN2 circuit? |
 | he has to visit TT2A to give a recommendation (foreseen, but very
unlikely before shut-down in November) |