minutes collaboration meeting 5.Nov.2004, written AF

bulleta parallel session took place: F.Haug, R.Bennett, Y.Ivanyushenkov, P.Titus
bulletno particular minutes are available
bulletthe results will be presented at the video-conference 9.Nov
bulletthe common base for further discussion is represented in this flow-scheme. This solution provides a testing of the operation even without the solenoid. Q: V1 is a built-in valve of the dewar?
bulletThis is is the foam material that was the basis for designing the cover without a vacuum jacket.